North Macedonia: Skopje university cut off over an electricity debt of about EUR 500,000
Four faculties of the Ss. Cyril and Methodius University in Skopje and the rectorate building were left without electricity on 18 November because of unpaid bills to EVN, Macedonian media reported. Supply was restored after a few hours on condition that the debt of about EUR 500,000 is paid by 20 November.
EuroEnergy Newsroom · North Macedonia · 2 min read
The faculties of Mechanical Engineering, Electrical Engineering, Natural Sciences and Mathematics, and Agriculture of the Ss. Cyril and Methodius University (UKIM) in Skopje, together with the rectorate building, were disconnected from the grid on the morning of 18 November over unpaid electricity bills, broadcaster Telma and the portal Republika reported.
What happened. After a few hours and an agreement with the supplier EVN, power was restored, but on a condition: the debt must be settled by the end of the working week, that is by Friday 20 November, or the faculties will be cut off again, according to the same sources.
The figures. This group of institutions owes the supplier about EUR 500,000, most of it attributable to the faculties and thus to the budget of the Ministry of Education and Science, Telma reported. According to the broadcaster, the Skopje Clinical Centre, the North Macedonia Post and some cultural institutions also have unpaid bills, and disconnections in the coming days cannot be ruled out for them.
Reactions. Education and Science Minister Vesna Janevska said on 19 November that “UKIM has electricity” and that, although there are debts, the ministry services them regularly; she noted that the budget revision had been published in the Official Gazette the day before and said she was convinced the problem would not recur. The Levica party called the situation “absurd” and recalled that in February the “Nikola Karev” student dormitory in Ohrid was left without power, heating and hot water, and in June it was cut off for a week over a debt of more than three million denars.
Background. Disconnecting public institutions for non-payment is not new: during the energy crisis the rail company MŽ Transport lost power, while the Skopje Clinical Centre was spared at the last moment, Telma recalled. It has not yet been announced whether the debt was paid by the Friday deadline.
Real-time data for the country is on the country page
More news
Comments
Be the first to comment.
