Hydrogen19 Nov 2026

Spain: Capital Energy seeks groundwater for Deméter, the 200 MW green hydrogen and ammonia plant in Baltanás

The Duero River Basin Authority has put out for public information a request by a Capital Energy subsidiary to draw up to 351,315.82 m³ of groundwater a year for the Deméter plant in Baltanás (Palencia). The project includes 200 MW of electrolysis and up to 27,720 tonnes of green hydrogen a year.

EuroEnergy Newsroom · Spain · 1 min read

Vedere de sus asupra localității Baltanás, cu acoperișuri de țiglă, turnul bisericii și câmpurile din jur; imagine ilustrativă, nu a amplasamentului uzinei
Foto: Henry Delors · CC BY-SA 4.0 · Wikimedia Commons

The Deméter project, a green hydrogen and ammonia plant with 200 MW of electrolysis planned by Capital Energy in the industrial area of Baltanás (Palencia province), has entered a new administrative stage. On 16 November the Duero River Basin Authority published in the Boletín Oficial del Estado the groundwater concession request filed by Green Capital Development 99, a group company, and pv magazine España reported on the procedure on 19 November.

What is requested. According to the official notice, the company is seeking a maximum volume of 351,315.82 m³ a year, with a maximum instantaneous flow of 11.86 l/s, from a 380 m deep borehole. The water would come from the Terciario Detrítico bajo los Páramos aquifer and would supply the "plant for the production of green hydrogen and ammonia of renewable character". Interested parties have one month to file objections.

The figures. According to pv magazine, the plant would produce up to 27,720 tonnes of hydrogen and up to 155,960 tonnes of ammonia a year, with annual consumption of 1,290.28 GWh coming exclusively from renewable sources. Hydrogen would be obtained by water electrolysis, nitrogen by an air separation unit, and the ammonia would be stored in a 3,750-tonne tank and shipped by refrigerated trucks.

Context. The project has a favourable environmental impact statement, published in July 2025, according to pv magazine, and Quantum Commodity Intelligence reported in March 2026 that the regional government of Castile and León had granted the environmental authorisation. The water request, reference C-0008/2026, had been announced in the BOE on 17 March 2026, with a requested flow of 13.55 l/s.

What comes next. The investment amount and the construction timetable do not appear in the documents consulted.

Real-time data for the country is on the country page.

More news

Comments

Be the first to comment.

Comments appear after the newsroom approves them.

← All the news

Solar calculatorWhat it costs, and how long until it pays for itself.Panels, panels with a battery, or just a battery if you already have panels. The calculator uses the solar radiation where you live, your household's consumption and local energy prices to estimate the cost, the yearly saving and the payback period.Open the page