DIW: Europe could need up to 350 TWh of hydrogen storage for the longest periods without wind and sun
The DIW Berlin institute estimates that a fully renewable European power system would need more than 170 TWh of long-duration storage, and around 350 TWh for the extreme winter of 1996/97. The authors call for public support for hydrogen storage in salt caverns, which takes between 5 and 15 years to plan and build.
EuroEnergy Newsroom · Germany · 2 min read
The German Institute for Economic Research (DIW Berlin) published a study on 25 November on periods when wind and sun generate very little electricity, known in German as “Dunkelflaute”, and on the storage needed to cover them. Martin Kittel, Alexander Roth and Wolf-Peter Schill analysed weather data from 1982–2019 for 34 European countries and modelled a power system based entirely on renewable sources.
The figures. In Germany, combined solar and wind output fell below half of the long-term average on average 112 times a year for 12 hours and 24 times a year for 24 hours, periods that batteries can cover, according to DIW. The longest Europe-wide episode occurred in the winter of 1996/97 and lasted 55 days. Taking planned grid expansion into account, the median need for long-duration storage in Europe exceeds 170 TWh, about 3% of projected annual consumption, and for the weather of 1996/97 it reaches about 350 TWh, about 7%.
Hydrogen in caverns. The solution examined is producing hydrogen from surplus renewable electricity, storing it in salt caverns and converting it back into electricity when needed. In Germany, hydrogen storage projects total almost 15 TWh, about 9% of current gas cavern capacity, and most are still at the study or concept stage. Planning and construction take between 5 and 15 years, and northern Germany has high potential for salt caverns, the institute notes.
What the authors propose. For private investors it is “hardly worthwhile” to maintain storage capacity for rarely used extreme cases, Schill told Clean Energy Wire. DIW recommends public guarantee and support instruments and the inclusion of long-duration storage in the capacity mechanism planned after 2032. “Investment decisions should therefore be made soon,” Schill said.
Context. Today such periods are covered by coal, gas or nuclear plants; Germany has begun tendering new gas plants that are to switch to green hydrogen later, Clean Energy Wire notes.
Real-time data for the country are on the country page
More news
Comments
Be the first to comment.
