Electricity in Formentera
Demand, generation and electricity links of Formentera, from Red Eléctrica's official data, every five minutes.
live Source: Red Eléctrica de España (REE) · last reading 19/10/2026, 17:00:00
Grid snapshot
Demand, generation and balance, updated every minute.
Source: Red Eléctrica de España (REE) · last reading 19/10/2026, 17:00:00
- Ibiza-Formentera link 6 MW95.3%
- Solar PV 0 MW4.7%
actual
Scheduled and forecast demand are published only for the Balearic system, not per island.
The arrows and figures are measurements, as of 19 October at 15:00. The transmission grid is not shown: we do not have its routes for this country yet.
Interconnections and submarine cables
The flow on each link is the one published by REE, every five minutes. The diagram is not to scale.
| Project | Flow now | End points | Voltage | Capacity | Length | Cables | In service since | Sources |
|---|---|---|---|---|---|---|---|---|
Balearic-Peninsula linkInterconexión eléctrica Península-Baleares (proyecto Rómulo) |
134 MW(Mainland Spain → Mallorca) |
Morvedre 400 kV (Sagunto, Valencia)↔ Santa Ponsa 220 kV (Calvià, Mallorca) |
± 250 kVdirect current (HVDC) |
400 MW (2 × 200 MW) |
237 km under the sea 244 km in total maximum depth 1,485 m |
3 |
2012 |
|
Mallorca-Menorca linkEnlace eléctrico Mallorca-Menorca |
6 MW(Mallorca → Menorca) |
Cala Mesquida (Mallorca)↔ Ciudadela (Menorca) |
132 kValternating current |
118 MVA |
41.7 km under the sea maximum depth 86 m |
1 |
2020 |
|
Mallorca-Ibiza linkEnlace eléctrico Mallorca-Ibiza (Rómulo 2) |
47 MW(Mallorca → Ibiza) |
Santa Ponsa (Mallorca)↔ Torrent (Ibiza) |
132 kValternating current |
2 × 100 MW |
118 km under the sea 126 km in total maximum depth 800 m |
2 |
2015–2016 |
|
Ibiza-Formentera linkEnlace eléctrico Ibiza-Formentera |
6 MW(Ibiza → Formentera) |
Torrent 132 kV (Ibiza)↔ Formentera 132 kV |
132 kValternating current |
2 × 53 MVA |
27.1 km under the sea maximum depth 62 m |
2 |
2023 |
Between Ibiza and Formentera there are also two older 30 kV circuits (1974 and 1982); their current status is not officially confirmed. The flow shown is the total published by REE.
System operator and transmission owner
Red Eléctrica de España (REE) operates the electricity system, balances generation and demand, runs the transmission grid and the submarine cables, and publishes the official real-time data. [1]
Distributors
The local grid, meters, outages and connections are the responsibility of the area's distributor. The Balearic Government lists three, by the first digits of the CUPS code on the bill. There is no official figure for the territory each one covers. [1] [2]
- e-distribución (Edistribución Redes Digitales, S.L.U. — grupo Endesa) CUPS ES0031 · CNMC R1-299
- Vall de Sóller Energía, S.L.U. (grupo El Gas) CUPS ES0169 · CNMC R1-056
- Sampol Distribución Eléctrica, S.L. CUPS ES0705 · CNMC R1-364
Retailers (comercializadores)
Consumers choose their retailer, under the same rules as in mainland Spain. On the regulated market (PVPC) supply comes from the reference retailers; on the free market, from any authorised retailer. No company is the islands' sole supplier. [1]
Reference retailers with national scope (CNMC list, consulted on 2026-09-17) [1]
- Energía XXI Comercializadora de Referencia, S.L.U. (Endesa)
- Curenergía Comercializador de Último Recurso, S.A.U.
- Comercializadora Regulada, Gas & Power, S.A.
- Baser Comercializadora de Referencia, S.A.
- Comercializador de Referencia Energético, S.L.U.
CNMC's official list of all retailers →
Generators
The plants are dispatched by REE. The list includes only what could be confirmed in official sources; unconfirmed fields are left empty.
Installed capacity of the Balearic system: 2,268 MW as of December 31, 2025, of which 425 MW is renewable. [REE]
| Plant | Location | Owner | Technology | Capacity | Status | Sources |
|---|---|---|---|---|---|---|
Central térmica de Es Ca Marí |
FormenteraEs Ca Marí |
Endesa |
Gas turbine |
— |
permanently closed |
Electricity market price applicable to the Balearic Islands
This price is not an individual commercial tariff and may be common to several islands.
Spain · day-ahead market (OMIE)
the cheapest third of the hours the most expensive third
The Balearic Islands have no electricity market of their own: REE dispatches the plants, with no bidding. The figures are those of the Spanish day-ahead market (OMIE), in EUR/MWh — a wholesale price, not a bill. The price at which island demand buys its energy is derived from the daily average mainland price, shaped by the hourly profile of Balearic demand (Royal Decree 738/2015, Annex I). BOE-A-2015-8646
The regulated PVPC price, paid by household consumers (in EUR/kWh), is published by e·sios for the Balearics too. We do not show it yet: access requires a personal token from REE.
- Demand, generation by technology and the flow on each link: published by REE for the system and for each island, every five minutes.
- Scheduled and forecast demand: only for the Balearic system.
- There is no market price specific to the Balearics, and REData publishes no prices for the Balearic system. The price shown is that of the Spanish market.
- The Balearic PVPC, the average demand price and the generation cost of the non-peninsular systems: published by e·sios, but accessible only with a personal token. They are not shown.
- REE data is shown for information purposes, citing the source and the time of the last update, in line with REE's legal notice.
REE · Seguimiento de la demanda · REData · OMIE · Aviso legal REE