local timeUTC+1
Electricity · real time

Montenegro

delayed Electricity prices, interval by interval → Installed capacity →

Energy market

The price of electricity today

The day-ahead auction result, in Podgorica time.

Interval by interval

Grid snapshot

Demand, generation and balance, updated every minute.

delayed data · as of 06/11/2026, 06:00:00

National consumption
423MW
Domestic production
27MW
396 MW below consumption. The real border balance is measured separately.
Importing now
459MW
Measured on the interconnectors, 108.5% of consumption. The 396 MW difference from “consumption minus production” is expected: generation-by-source as published does not cover everything that is generated.
Day-ahead price
316.0EUR/MWh
CO₂ estimated
17g/kWhestimated

Physical cross-border flows

Electricity measured crossing every border in October 2026, valued at this zone's day-ahead price.

Physical exports 451,014 MWh estimated market value 94,741,706 €, at 210.06 €/MWh
Physical imports 551,659 MWh estimated market value 127,412,011 €, at 230.96 €/MWh
Estimated market value −32,670,306 € the month averaged 224.80 €/MWh
Border with Out, MWh at €/MWh In, MWh at €/MWh Difference €
Italy 148,315 170.43 328,977 261.11 −60,623,862
Albania 55,361 238.66 95,242 187.23 −4,619,931
Bosnia and Herzegovina 74,883 225.65 70,805 199.85 2,747,331
Serbia 123,424 220.12 1,501 240.76 26,807,212
Kosovo 49,032 248.53 55,134 166.27 3,018,945

32,670,306 € for 100,645 MWh that stayed in the country works out at 324.61 € per megawatt-hour, in a month that averaged 224.80.

  • Energy that stayed, at the month's average price 22,625,318 69.3%
  • What came in arrived above that average 3,397,426 10.4%
  • What went out left below it 6,647,562 20.3%

The first line is energy the country needed and got. The other two — 10,044,988 € together — come not from how much moved but from when: cheap hours to sell in, expensive hours to buy in. That is the price of a timing mismatch, not a loss.

Official validation AWAITING OFFICIAL ANRE DATA

Physical cross-border flows and commercial electricity trades measure different phenomena. ANRE data is shown as an independent official benchmark and should not be interpreted as an exact reconciliation.

All months, every border

Not an invoice. Cross-border electricity is not sold country to country: the markets are coupled and the physical flow is the outcome of a shared auction. These figures value the measured flow at this zone's own day-ahead price, so both directions can be compared on the same scale.

Flows are measured, quarter-hour by quarter-hour; hourly borders are spread across the four quarters they cover, so every megawatt-hour meets the price that was actually in force. Energy entering the country is not the same as energy consumed here — some of it passes through.

Who we sold energy to

Who we sold energy to when they needed it — last 30 days

data for the last 30 days · 30 days covered

  • Serbia 125.96 GWh
    181 MW on average · 31.9%
  • Albania 81.96 GWh
    259 MW on average · 20.7%
  • Kosovo 69.37 GWh
    135 MW on average · 17.5%
  • Italy 65.87 GWh
    201 MW on average · 16.7%
  • Bosnia and Herzegovina 52.25 GWh
    196 MW on average · 13.2%

What we sent our neighbours, per border. Energy summed from quarter-hour averages over the days actually covered by the archive. The average power is over the hours in which it flowed this way, not over every hour. A country can appear in both lists: with the same neighbour we import in some hours and export in others.

Who we bought energy from

Who sold us energy when we needed it — last 30 days

data for the last 30 days · 30 days covered

  • Italy 427.31 GWh
    385 MW on average · 70.7%
  • Bosnia and Herzegovina 100.58 GWh
    222 MW on average · 16.6%
  • Albania 53.17 GWh
    132 MW on average · 8.8%
  • Kosovo 22.82 GWh
    112 MW on average · 3.8%
  • Serbia 0.40 GWh
    20 MW on average · 0.1%

What our neighbours sent us, per border. Energy summed from quarter-hour averages over the days actually covered by the archive. The average power is over the hours in which it flowed this way, not over every hour. A country can appear in both lists: with the same neighbour we import in some hours and export in others.

Energy sources

delayed data · as of 06/11/2026, 06:00:00

Onshore wind
14MW
51.7% of total
Hydro reservoir
13MW
48.3% of total
Lignite
0MW
0.0% of total

Source shares

Every source, with its share and the emission factor used in the carbon estimate.

delayed data · as of 06/11/2026, 06:00:00

Onshore wind: 14 MW Hydro reservoir: 13 MW 27 MW total
  • Onshore wind 52% 14MW
    Renewable
    yes
    Emission factor
    11 g CO₂eq/kWh
    Adds to the national average
    5.7 g/kWh
  • Hydro reservoir 48% 13MW
    Renewable
    yes
    Emission factor
    24 g CO₂eq/kWh
    Adds to the national average
    11.6 g/kWh

Renewable energy

Share of clean sources in total production.

delayed data · as of 06/11/2026, 06:00:00

Onshore wind: 14 MW · Hydro reservoir: 13 MW 100,0% of production
  • Onshore wind14 MW
  • Hydro reservoir13 MW

Energy radar

delayed data · as of 06/11/2026, 06:00:00

3 7 10 14 Solar: 0 MW Wind: 14 MW Hydro: 13 MW Nuclear: 0 MW Gas: 0 MW Coal: 0 MW Solar Wind Hydro Nuclear Gas Coal

Italy 582 MW import Albania 206 MW export Kosovo 166 MW export Serbia 166 MW export Bosnia and Herzegovina 83 MW import MONTENEGRO cross-border energy flows THE NATIONAL POWER SYSTEM IN ITS REGIONAL CONNECTIONS Import into Montenegro (energy coming in) Export from Montenegro (energy going out) Total cross-border exchange 1.203 MW Import 665 MW Export 538 MW 0 50 100 200 km N

The arrows and figures are measurements, as of 6 November at 05:00. The transmission grid is not shown: we do not have its routes for this country yet.

Exchanges with neighbours

Green = Montenegro exports, orange = Montenegro imports.

delayed data · as of 06/11/2026, 06:00:00

Italy Italy: 582 MW Albania Albania: 206 MW Bosnia and Herzegovina Bosnia and Herzegovina: 83 MW 0

The price right now, across Europe

The interval in progress, live data from right now, in every bidding zone we have a price for.

live data · as of 06/11/2026, 08:00:00

Montenegro is 27 of 46, counting from the dearest. Average across zones: 278 EUR/MWh.

  1. 1 IE 437EUR/MWh
  2. 2 SE (SE4) 355EUR/MWh
  3. 3 DK (DK2) 349EUR/MWh
  4. 4 AL 340EUR/MWh
  5. 4 XK 340EUR/MWh
  6. 6 DK (DK1) 339EUR/MWh
  7. 6 AT 339EUR/MWh
  8. 6 BE 339EUR/MWh
  9. 6 CZ 339EUR/MWh
  10. 6 DE and LU 339EUR/MWh
  11. 6 FR 339EUR/MWh
  12. 6 HR 339EUR/MWh
  13. 6 HU 339EUR/MWh
  14. 6 IT (CENTRE_NORTH) 339EUR/MWh
  15. 6 IT (CENTRE_SOUTH) 339EUR/MWh
  16. 6 IT (NORTH) 339EUR/MWh
  17. 6 IT (SARDINIA) 339EUR/MWh
  18. 6 IT (SOUTH) 339EUR/MWh
  19. 6 NL 339EUR/MWh
  20. 6 PL 339EUR/MWh
  21. 6 RO 339EUR/MWh
  22. 6 SI 339EUR/MWh
  23. 6 SK 339EUR/MWh
  24. 24 RS 338EUR/MWh
  25. 25 CH 334EUR/MWh
  26. 26 LT 329EUR/MWh
  27. 27 ME 316EUR/MWh
  28. 28 MK 301EUR/MWh
  29. 29 ES 292EUR/MWh
  30. 29 PT 292EUR/MWh
  31. 31 BG 291EUR/MWh
  32. 32 IT (CALABRIA) 282EUR/MWh
  33. 32 IT (SICILY) 282EUR/MWh
  34. 34 SE (SE3) 280EUR/MWh
  35. 35 GR 222EUR/MWh
  36. 35 NO (NO2) 222EUR/MWh
  37. 37 NO (NO5) 208EUR/MWh
  38. 38 NO (NO1) 203EUR/MWh
  39. 39 EE 150EUR/MWh
  40. 39 LV 150EUR/MWh
  41. 39 FI 150EUR/MWh
  42. 42 NO (NO3) 95EUR/MWh
  43. 43 TR 56EUR/MWh
  44. 44 SE (SE1) 36EUR/MWh
  45. 45 SE (SE2) 35EUR/MWh
  46. 46 NO (NO4) 17EUR/MWh

Wholesale prices for the interval covering this moment, bidding zone by bidding zone — countries with several zones appear once per zone, with its code in brackets. The average is arithmetic across zones, not weighted by demand: a small zone counts as much as a large one. The figures exclude network tariffs, excise duty and VAT.

What balancing cost, in the last 24 hours

The source for this country does not publish this dataset. Nothing is estimated in its place.

Who consumes: the base, the work rhythm, the day

The source has not sent anything recently. The card returns when the data does.

The operator's consumption forecast

How much the country is expected to consume, hour by hour, according to the forecast the transmission operator publishes for today and tomorrow. The line is the forecast; the bars, consumption measured so far.

forecast issued 06/11/2026, 07:19:50 · ENTSO-E

Operator's forecast Measured consumption, hourly average
0 125 250 375 500 00:00 — 171 MW 02:00 — 182 MW 03:00 — 194 MW 04:00 — 194 MW 05:00 — 284 MW 06:00 — 423 MW today tomorrow now 00 06 12 18 00 06 12 18
Today's peak
473MW
at 18:00
Today's low
260MW
at 04:00
Next hour
379MW
at 09:00
Tomorrow's peak
0MW
at 00:00

The forecast is the transmission operator's, published on its own platform — not a model of ours. It is revised during the day; for each hour the latest issue is shown. The running hour, in the bars, only shows what has accumulated so far.

How much prosumers produce right now

The source for this country does not publish this dataset. Nothing is estimated in its place.

Today's wind, hour by hour

Measured hourly average for the current local day. The running hour only shows what has accumulated so far.

delayed data · as of 06/11/2026, 06:00:00

10 20 00:00 — 15 MW 01:00 — 14 MW 02:00 — 10 MW 03:00 — 14 MW 04:00 — 20 MW 05:00 — 17 MW 06:00 — 14 MW 00 06 12 18 23
How we estimated 17 g CO₂/kWh

This is an estimate, not a measurement. There is no official carbon-intensity measurement for this country, so we compute it from the production mix.

Σ(source generation × source factor) / Σ(generation), over positive values, with life-cycle factors.

The factors are life-cycle values — they include construction and fuel, not just combustion. That is why solar, wind and nuclear are not zero. Source: IPCC AR5 WG3, Anexa III, Tabelul A.III.2 (mediane), version 1.

SourceMWg/kWh
Onshore wind1411
Hydro reservoir1324

Energy news

See all the news

The generation fleet, 2026

Installed capacity by source, as the operator reports it.

Installed capacity 1,032MW reported for 2026 Cleaner energy for tomorrow
Renewables 79.6% 822 MW
Largest source Hydro reservoir 33.2%
Against 2025 +55 MW
Source Capacity (MW) Of total
Hydro reservoir 342 33.2%
Run-of-river hydro 307 29.8%
Lignite 210 20.4%
Onshore wind 173+55 16.7%
All the capacity statistics
How the renewable share is computed

Σ(renewable sources, positive values only) / Σ(all sources, positive only).

Numerator: Onshore wind, Hydro reservoir.

Denominator: 27 MW.

Pumped-storage hydro and waste are not counted as renewable — the first would double-count energy, the second is partly fossil and its biogenic fraction cannot honestly be separated.

Consumption — 24 hours

24 hours 48 hours 7 days 30 days 90 days 1 year all
0200400 09:00 AM07:00 PM06:00 AM

21 points, PT5M resolution. Long ranges are served from precomputed aggregates — a one-year chart from per-minute data would push hundreds of thousands of points into the browser for nothing. Our archive starts at 2015-01-01 00:00 UTC.

By source

Each source has its own page, with history and context:

Wind power · Hydropower · Power from coal

Alerts

Get a browser notification when something you care about happens. The rules are evaluated locally, on the live stream — they work as long as a tab with the site is open. Email alerts arrive together with accounts, in a later phase.

Put this data on your site

Copy the snippet below. The widget updates itself and loads no JavaScript into your page.

<iframe src="https://euroenergy.live/widgets/country/montenegro?lang=en" width="100%" height="380" style="border:1px solid #dbe1ec;border-radius:16px;max-width:400px" loading="lazy" title="Montenegro — Electricity in real time"></iframe>

View the widget · Download CSV

Source: ENTSO-E Transparency Platform · shares are computed on positive values, because solar farms draw from the grid at night · JSON API: /api/v1/countries/ME/latest

Solar calculatorWhat it costs, and how long until it pays for itself.Panels, panels with a battery, or just a battery if you already have panels. The calculator uses the solar radiation where you live, your household's consumption and local energy prices to estimate the cost, the yearly saving and the payback period.Open the page