Belgium: each new Google data centre building in Hainaut would use 0.89 TWh, 1% of the country's consumption
Each new data centre building that Google is preparing in the province of Hainaut would use 0.89 TWh of electricity, or one per cent of Belgium's current consumption, according to estimates by the intermunicipal body Idea cited by Le Soir. The company is also negotiating for around 50 more hectares at Feluy, for a €2.4 billion project.
EuroEnergy Newsroom · Belgium · 2 min read
Google's new artificial intelligence data centre installations in Hainaut will drive a sharp rise in the company's electricity consumption, the daily Le Soir reported on 21 November. According to estimates by the intermunicipal body Idea, obtained by the newspaper, each new building would use 0.89 TWh, or one per cent of Belgium's current electricity consumption. Google does not publish consumption figures for its sites.
The figures. The municipality of Saint-Ghislain, with 24,000 inhabitants, where Google is expanding on an 85-hectare site, was Wallonia's second-largest energy consumer in 2023 after Charleroi, at 1.3 TWh, as much as Liège and Namur combined, according to SPW Energie data cited by Le Soir. The magazine Moustique notes, citing the office of Walloon Energy Minister Cécile Neven, that data centres already account for around 10% of Wallonia's electricity consumption, and estimates by transmission system operator Elia show an almost eightfold increase by 2034.
Feluy. According to Le Soir, as reported by The Brussels Times and Antenne Centre, Google is negotiating to buy two former industrial plots totalling around 50 hectares on the old BASF petrochemical site at Feluy. The project, valued at €2.4 billion, would include three data centres, coming into operation in 2031, 2032 and 2036. Separately, at Ecaussinnes, the subsidiary Crystal Computing is asking to drop two of the three authorised buildings, enlarge the remaining one and switch from water cooling to air cooling.
The grid. Arnaud Collignon, energy specialist at the Canopea federation, told Moustique that in Wallonia “there is almost no connection capacity left”. According to the regional authorities, cited by the same magazine, 1,066 connection requests were pending on the Ores distribution network. Google says around 85% of the energy consumed at its site is decarbonised and that it has supported 365 MW of new clean energy capacity in Belgium.
What comes next. The exclusivity agreement for the Feluy land, signed with Idea in May 2025, expires on 18 December, and until then Google can carry out further studies.
Real-time data for the country is on the country page.
More news
Comments
Be the first to comment.
