Portugal · island electricity system

Electricity in Madeira

The electricity system of Madeira: who operates it, how it is supplied, its plants and interconnections, and what the operator publishes.

Latest official data Real-time electricity data is not currently published through a verified public source. The values shown are the latest available official data.

EEM — Empresa de Electricidade da Madeira does not publish real-time electricity data for Madeira. No figure is shown here that the operator has not published; the latest official publication is DREM — Energia elétrica na RAM (trimestral) (quarterly).

Annual generation

Official annual electricity generation – 2020

Total
785,910MWh
Renewable share
27.5%
geothermal, hydro, wind, solar, waste, biogas
Thermal (fuel oil, diesel): 570650 MW Hydro: 64400 MW Wind: 83810 MW Solar PV: 27230 MW Waste (CVE): 40740 MW 786 GWh
By sourceMWhshare
Thermal (fuel oil, diesel) 570,650 72.6 %
Hydro 64,400 8.2 %
Wind 83,810 10.7 %
Solar PV 27,230 3.5 %
Waste (CVE) 40,740 5.2 %

Reporting period: 2020 [source]

Annual consumption and peak

Energy delivered to the grid · 2020
785.9GWh
Annual peak load · 2020
138.7MW
reached on 06/01/2020
20192020
Energy delivered to the grid—785.9
Annual peak load142.2138.7

Billed consumption per island is not published: EDA gives it only for the region. Energy delivered to the grid is consumption plus losses, from EDA's management report. We do not estimate them.

Reporting period: 2020 · 2019–2020 [source]

Installed capacity

MW

Actual, at 2020-12

Thermal (fuel oil, diesel)205.7
Hydro77.2
Wind63.1
Solar PV20.2
Waste (CVE)8.0
Total374.2

Reporting period: 2020-12 [source]

Capacity at generator level in EDA's plants. The right-hand column is the 2022–2024 investment plan as approved; it does not say what was built.

Sources and updates

Every figure on this page comes from one of the documents below. The worker checks them daily (plans, reports) and weekly (tariffs); if a document changes or does not respond, the values here stay the last validated ones.

MADEIRA EEM — Empresa de Electricidade da Madeira PORTUGAL · ISLAND ELECTRICITY SYSTEM Import into Madeira (energy coming in) Export from Madeira (energy going out) 0 50 100 200 km N

The arrows and figures are measurements. The transmission grid is not shown: we do not have its routes for this country yet.

Interconnections and submarine cables

Madeira has no electrical connection to another system: everything consumed is generated on the island.

Who supplies the electricity?

Who operates, distributes and generates in Madeira; every line has its official source. Verified on 2026-09-19.

RoleCompany
System and grid operator
EEM — Empresa de Electricidade da Madeira, S.A.produção, transporte, distribuição e comercialização; Madeira e Porto Santo, dois sistemas isolados
Regulator

Generators

PlantLocationOwner TechnologyCapacityStatus Sources
Central Térmica da Vitória (CTV II)
Funchal
EEM
Natural gas
Oil
100 MW
in service
Central térmica do Caniçal
Caniçal
—
Oil
36 MW
in service
Parques eólicos (12)
—
produtores privados
Onshore wind
63.1 MW
in service
Fotovoltaico (770 instalações)
—
produtores privados
Solar
20.2 MW
in service
Valorização de resíduos urbanos
—
—
Waste
8 MW
in service
Socorridos — bombagem
Socorridos
EEM
Pumped-storage hydro
11.3 MW
in service
Central do Porto Santo
Porto Santo
EEM
Oil
17.3 MW
in service

What data exists and what does not

EEM — Empresa de Electricidade da Madeira · DREM — Energia elétrica na RAM (trimestral)

Frequently asked questions

Where do the figures on this page come from?

There are no live figures: EEM — Empresa de Electricidade da Madeira does not publish real-time data. The infrastructure facts come from official documents, each with its link, and the periodic figures are in DREM — Energia elétrica na RAM (trimestral).

Is Madeira connected to another electricity system?

No. Madeira is an isolated system: everything consumed there is generated on the island.

Is there an electricity market price for Madeira?

There is no market price for Madeira: the island is supplied under a regulated tariff, without a wholesale market of its own. No price from another zone is shown here.

Portugal →