Electricity in Åland
Demand, generation by technology, renewables, CO₂ and interconnections of Åland, from the data published by Kraftnät Åland.
live Source: Kraftnät Åland · last reading 19/10/2026, 11:29:10
Grid snapshot
Demand, generation and balance, updated every minute.
Source: Kraftnät Åland · last reading 19/10/2026, 11:29:10
What covers demand right now
Generation by technology now, plus what comes in over the interconnections
- Sverigekabeln 34 MW99.2%
- ÅL-Link 0 MW0.8%
The arrows and figures are measurements, as of 19 October at 08:29. The transmission grid is not shown: we do not have its routes for this country yet.
Interconnections and submarine cables
The flow on each link is the one published by REE, every five minutes. The diagram is not to scale.
| Project | Flow now | End points | Voltage | Capacity | Length | Cables | In service since | Sources |
|---|---|---|---|---|---|---|---|---|
Sverigekabeln |
34 MW→ Åland |
Tellholm (Hammarland)↔ Senneby (Sverige) |
110 kValternating current |
80 MW (abonnemang 58 MW) |
— |
— |
— |
|
ÅL-Link |
0 MW→ Åland |
Ytterby↔ Nådendal / Naantali (Finland) |
HVDCdirect current (HVDC) |
100 MW |
152 km under the sea |
— |
2015 |
|
Gustavskabeln |
no flow |
Brändö↔ Gustavs / Kustavi (Finland) |
45 kValternating current |
10 MW |
— |
— |
— |
Who supplies the electricity?
Who operates, distributes and generates in Åland; every line has its official source. Verified on 2026-09-19.
| Role | Company |
|---|---|
System and grid operator |
Kraftnät Åland Abstamnätet 110/45 kV, systemansvar; ägs av Ålands landskapsregering |
Distribution |
|
Distribution |
|
Main generator |
|
Main generator |
|
Market operator |
Generators
The operator does not publish a total installed capacity for Åland.
| Plant | Location | Owner | Technology | Capacity | Status | Sources |
|---|---|---|---|---|---|---|
Långnabba (10 verk i 4 MW-klassen) |
Eckerö |
Vind AX Ab |
Onshore wind |
— |
in service |
|
Båtskär (6 verk) |
Båtskärsarkipelagen |
Leovind Ab |
Onshore wind |
— |
in service |
|
Gasturbiner Tingsbacka (10 + 25 MW) |
Jomala |
Kraftnät Åland |
Oil |
35 MW |
operation limited to a number of hours per year |
Day-ahead market price in the SE3 zone
Wholesale price of the bidding zone, in EUR/MWh — not a household tariff.
SE3 · Nord Pool
the cheapest third of the hours the most expensive third
Åland has no bidding zone of its own: it belongs to the SE3 zone of the Nord Pool day-ahead market, and its price is that zone's price. EUR/kWh is obtained only by dividing by 1000.
- Real-time data: demand and generation by technology, as published by Kraftnät Åland; the page shows the latest reading with its time.
- CO₂ emissions: estimated from the generation mix with lifecycle factors; nobody publishes measured emissions for Åland.
- Market price: that of the SE3 zone on Nord Pool, of which the island is part.
- Flows on the interconnections: published in real time.
- Data licence: Kraftnät Åland does not state one. The data are shown with attribution and the time of reading and are not redistributed through the API.
Frequently asked questions
Where do the figures on this page come from?
From Kraftnät Åland. Every value keeps the time of its reading and the link to the source; nothing is estimated except the CO₂ figure, which says so.
Is Åland connected to another electricity system?
Yes, through: Sverigekabeln, ÅL-Link, Gustavskabeln. The table above gives the voltage, capacity, length and year of each link, with its source.
Is there an electricity market price for Åland?
Åland has no bidding zone of its own: it belongs to the SE3 zone of the Nord Pool day-ahead market, and its price is that zone's price. EUR/kWh is obtained only by dividing by 1000.