Tqabbil tal-fornituri tal-enerġija — Il-Bożnija-Ħerzegovina
Qabbel malajr l-offerti tal-fornituri u agħżel l-aħjar waħda għall-konsum tiegħek.
| # | Fornitur | Prezz finali(BAM/kWh) | Parti fissa(BAM/xahar) | Spiża stmata/xahar(300 kWh) | Dettalji tal-offerta |
|---|---|---|---|---|---|
| 1 | JP Elektroprivreda BiH d.d. SarajevoL-irħasJavno snabdijevanje · domaćinstvo · I tarifna grupa (D-1) · Zeleni blok 0–350 kWh, plavi 350–1.000 kWh, crveni preko 1.000 kWh |
0.1894 | 5.62 | BAM 62.44 | Ara l-offerta |
L-irħas offerta: JP Elektroprivreda BiH d.d. Sarajevo — BAM 0.1894/kWh — Spiża stmata: BAM 62.44/xahar (300 kWh)
Il-prezzijiet huma finali, bit-taxxi kollha u l-VAT.
Aġġornat: 01/09/2025Sors: RERS and FERK — regulated public-supply prices (official bill calculators of RERS and Elektroprivreda BiH). Source: Regulatory Commission for Energy of Republika Srpska (RERS), decision of 22 Dec 2025 and household bill calculator; Federal Electricity Regulatory Commission (FERK) and JP Elektroprivreda BiH, public-supply price list from 1 Sep 2025 and bill calculator.
Kif nikkalkulaw: Households in Bosnia and Herzegovina are supplied at regulated public-supply prices by the utility of their territory; choose your territory. Covered: Republika Srpska and the Federation area of Elektroprivreda BiH (not yet: the EP HZHB area and Brčko District). Monthly bills are for a single-rate meter and a 30-day period, computed as on the official calculators: Republika Srpska — energy plus network in monthly blocks (white up to 500 kWh at 0.1329 KM/kWh, blue 500–1,500 at 0.1714, red above 1,500 at 0.2667), billing power 3.3 kW × 3.4892 KM, supply service 2.48 KM and the renewables fee 0.0007 KM/kWh; Elektroprivreda BiH — energy in blocks (green up to 350 kWh at 0.0908 KM/kWh, blue 350–1,000 at 0.0938, red above 1,000 at 0.0968), metering point 3.05 KM, network 0.0682 KM/kWh plus 1.75 KM, and the renewables fee 0.002896 KM/kWh. Both include 17% VAT. The RTV licence fee collected on the bill is not included.
