Il-Montenegro — flussi fiżiċi transfruntiera, 2026
Kull xahar tas-sena, kull fruntiera, f’enerġija u fi flus. Il-flussi huma mkejla; kull megawatt-siegħa tiġi vvalutata bil-prezz ta’ ġurnata bil-quddiem taż-żona proprja (Il-Montenegro) għall-kwart ta’ siegħa li fih effettivament qasmet.
| Xahar | Konsum, MWh | Esportazzjonijiet fiżiċi | Importazzjonijiet fiżiċi | Prezz taż-żona, €/MWh | Differenza € | Importazzjoni ÷ konsum | ||||
|---|---|---|---|---|---|---|---|---|---|---|
| MWh | €/MWh | € | MWh | €/MWh | € | |||||
| Jannar | 320,345 | 132,635 | 101.23 | 13,426,941 | 95,066 | 112.95 | 10,737,461 | 103.45 | 2,689,481 | 29.7% |
| Frar | 272,139 | 158,644 | 59.51 | 9,440,222 | 70,959 | 60.71 | 4,308,085 | 63.91 | 5,132,137 | 26.1% |
| Marzu | 258,128 | 188,214 | 92.54 | 17,418,065 | 104,052 | 84.22 | 8,763,220 | 87.78 | 8,654,845 | 40.3% |
| April | 194,270 | 138,951 | 95.91 | 13,326,938 | 104,682 | 84.69 | 8,865,779 | 89.44 | 4,461,158 | 53.9% |
| Mejju | 194,739 | 130,304 | 88.82 | 11,573,352 | 132,003 | 87.37 | 11,533,484 | 91.10 | 39,868 | 67.8% |
| Ġunju | 244,767 | 164,500 | 94.80 | 15,593,791 | 122,655 | 93.70 | 11,493,038 | 100.30 | 4,100,753 | 50.1% |
| Lulju | 301,134 | 191,989 | 110.10 | 21,137,167 | 145,075 | 112.74 | 16,355,456 | 117.21 | 4,781,711 | 48.2% |
| Awwissu | 349,899 | 200,130 | 139.49 | 27,915,812 | 150,100 | 140.34 | 21,065,565 | 149.73 | 6,850,247 | 42.9% |
| Settembru34.0% tas-sigħat | 62,820 | 45,514 | 150.90 | 6,868,278 | 32,601 | 154.57 | 5,039,116 | 163.37 | 1,829,162 | 51.9% |
| Total | 2,198,241 | 1,350,880 | 101.19 | 136,700,568 | 957,193 | 102.55 | 98,161,206 | 105.00 | 38,539,362 | 43.5% |
Il-konsum jitkejjel separatament, bħala l-qawwa medja ta’ kull siegħa miġbura fuq ix-xahar — mhux billi jingħaddu l-qari, għax is-sorsi jippubblikaw b’ritmi differenti. L-aħħar kolonna tpoġġi l-importazzjonijiet ħdejh bħala skala; mhijiex ċifra ta’ dipendenza, għax parti minn dak li jidħol jgħaddi dritt għal ġar ieħor.
Minn fejn ġejja d-differenza
38,539,362 € għal enerġija ta’ 393,687 MWh li baqgħet fil-pajjiż: jiġifieri 97.89 € għal kull megawatt-siegħa, f’xahar b’medja ta’ 105.00.
L-ewwel linja hija enerġija li l-pajjiż kellu bżonn u kiseb. Iż-żewġ oħrajn — 2,796,609 € flimkien — ma ġejjinx minn kemm iċċaqlaq iżda minn meta: bejgħ f’sigħat irħas, xiri f’sigħat għaljin. Dak huwa l-prezz ta’ nuqqas ta’ qbil fil-ħin, mhux telf.
Validazzjoni uffiċjali
Il-fluss fiżiku mkejjel, ivverifikat kontra l-iskambji kummerċjali ppubblikati (ANRE).
| Xahar | Nett fiżiku, MWh | Nett kummerċjali, MWh | Differenza, MWh | Status |
|---|---|---|---|---|
| Jannar | — | — | — | QED NISTENNEW ID-DATA UFFIĊJALI TAL-ANRE |
| Frar | — | — | — | QED NISTENNEW ID-DATA UFFIĊJALI TAL-ANRE |
| Marzu | — | — | — | QED NISTENNEW ID-DATA UFFIĊJALI TAL-ANRE |
| April | — | — | — | QED NISTENNEW ID-DATA UFFIĊJALI TAL-ANRE |
| Mejju | — | — | — | QED NISTENNEW ID-DATA UFFIĊJALI TAL-ANRE |
| Ġunju | — | — | — | QED NISTENNEW ID-DATA UFFIĊJALI TAL-ANRE |
| Lulju | — | — | — | QED NISTENNEW ID-DATA UFFIĊJALI TAL-ANRE |
| Awwissu | — | — | — | QED NISTENNEW ID-DATA UFFIĊJALI TAL-ANRE |
| Settembru | — | — | — | QED NISTENNEW ID-DATA UFFIĊJALI TAL-ANRE |
Il-volumi grossi jvarjaw min-natura tagħhom: l-indikaturi uffiċjali jinkludu t-tranżiti, u tranżitu jingħadd darba meta jidħol u darba meta joħroġ, filwaqt li fruntiera fiżika tarah darba biss. Iċ-ċifri netti jikkonverġu, għax it-tranżiti jikkanċellaw lil xulxin — għalhekk il-paragun isir fuq in-nett.
Il-perċentwal jirrelata d-differenza man-nett kummerċjali tax-xahar. F’xahar b’nett żgħir, l-istess differenza f’MWh tagħti perċentwal akbar — għalhekk id-differenza tintwera dejjem ukoll f’MWh.
ANRE: dawn l-iskambji jiġu ppubblikati bħala bilanċ fiżiku f’GWh. Ma jiġi ppubblikat l-ebda valur tal-importazzjoni jew tal-esportazzjoni u l-ebda prezz medju għal kull direzzjoni, għalhekk ma jistax isir paragun fil-flus.
Il-flussi fiżiċi transfruntiera u l-iskambji kummerċjali tal-elettriku jkejlu fenomeni differenti. Id-data tal-awtorità (ANRE) tintwera bħala punt ta’ referenza uffiċjali indipendenti u m’għandhiex tiġi interpretata bħala rikonċiljazzjoni eżatta.
Fruntiera b’fruntiera
L-Italja
Xahar b’xahar, din il-fruntiera vista min-naħa waħda: Il-Montenegro.
| Xahar | Esportazzjonijiet fiżiċi MWh | €/MWh | € | Importazzjonijiet fiżiċi MWh | €/MWh | € | Differenza € |
|---|---|---|---|---|---|---|---|
| Jannar | 42,512 | 83.22 | 3,537,942 | 36,582 | 144.49 | 5,285,837 | −1,747,896 |
| Frar | 95,043 | 54.14 | 5,145,233 | 7,131 | 100.42 | 716,048 | 4,429,185 |
| Marzu | 129,917 | 97.35 | 12,647,790 | 2,779 | 141.03 | 391,917 | 12,255,873 |
| April | 106,361 | 101.77 | 10,824,583 | 6,827 | 114.04 | 778,627 | 10,045,955 |
| Mejju | 62,999 | 89.76 | 5,654,747 | 35,033 | 106.88 | 3,744,381 | 1,910,367 |
| Ġunju | 121,402 | 94.24 | 11,440,395 | 9,031 | 147.44 | 1,331,429 | 10,108,966 |
| Lulju | 172,567 | 109.02 | 18,813,579 | 8,922 | 198.38 | 1,770,017 | 17,043,561 |
| Awwissu | 177,753 | 139.39 | 24,776,317 | 4,220 | 235.70 | 994,715 | 23,781,603 |
| Settembru | 34,669 | 150.57 | 5,220,232 | 2,925 | 214.14 | 626,337 | 4,593,895 |
| Total | 943,222 | 103.96 | 98,060,817 | 113,450 | 137.85 | 15,639,308 | 82,421,509 |
L-Albanija
Xahar b’xahar, din il-fruntiera vista min-naħa waħda: Il-Montenegro.
| Xahar | Esportazzjonijiet fiżiċi MWh | €/MWh | € | Importazzjonijiet fiżiċi MWh | €/MWh | € | Differenza € |
|---|---|---|---|---|---|---|---|
| Jannar | 0 | — | 0 | 44,020 | 92.72 | 4,081,613 | −4,081,613 |
| Frar | 0 | — | 0 | 50,595 | 55.60 | 2,812,855 | −2,812,855 |
| Marzu | 0 | — | 0 | 63,560 | 83.78 | 5,325,142 | −5,325,142 |
| April | 0 | — | 0 | 27,075 | 84.72 | 2,293,910 | −2,293,910 |
| Mejju | 0 | — | 0 | 58,253 | 92.79 | 5,405,107 | −5,405,107 |
| Ġunju | 0 | — | 0 | 54,193 | 95.14 | 5,155,636 | −5,155,636 |
| Lulju | 0 | — | 0 | 39,418 | 104.39 | 4,114,745 | −4,114,745 |
| Awwissu | 0 | — | 0 | 50,842 | 130.37 | 6,628,464 | −6,628,464 |
| Settembru | 4,143 | 151.09 | 625,996 | 8,060 | 135.54 | 1,092,465 | −466,470 |
| Total | 4,143 | 151.09 | 625,996 | 396,017 | 93.20 | 36,909,937 | −36,283,942 |
Il-Bożnija-Ħerzegovina
Xahar b’xahar, din il-fruntiera vista min-naħa waħda: Il-Montenegro.
| Xahar | Esportazzjonijiet fiżiċi MWh | €/MWh | € | Importazzjonijiet fiżiċi MWh | €/MWh | € | Differenza € |
|---|---|---|---|---|---|---|---|
| Jannar | 27,274 | 100.25 | 2,734,315 | 10,940 | 101.84 | 1,114,102 | 1,620,213 |
| Frar | 13,661 | 54.40 | 743,223 | 9,556 | 63.66 | 608,293 | 134,931 |
| Marzu | 26,233 | 70.75 | 1,856,056 | 17,711 | 91.52 | 1,620,971 | 235,086 |
| April | 12,896 | 72.12 | 930,089 | 44,601 | 86.47 | 3,856,801 | −2,926,712 |
| Mejju | 32,112 | 98.21 | 3,153,796 | 15,097 | 40.95 | 618,284 | 2,535,511 |
| Ġunju | 24,520 | 103.47 | 2,537,055 | 26,494 | 77.55 | 2,054,655 | 482,399 |
| Lulju | 9,523 | 117.97 | 1,123,407 | 53,331 | 110.59 | 5,898,098 | −4,774,691 |
| Awwissu | 11,774 | 138.34 | 1,628,821 | 44,301 | 149.31 | 6,614,537 | −4,985,716 |
| Settembru | 1,430 | 155.56 | 222,377 | 10,075 | 162.11 | 1,633,218 | −1,410,841 |
| Total | 159,424 | 93.64 | 14,929,139 | 232,105 | 103.48 | 24,018,959 | −9,089,821 |
Il-Kosovo
Xahar b’xahar, din il-fruntiera vista min-naħa waħda: Il-Montenegro.
| Xahar | Esportazzjonijiet fiżiċi MWh | €/MWh | € | Importazzjonijiet fiżiċi MWh | €/MWh | € | Differenza € |
|---|---|---|---|---|---|---|---|
| Jannar | 25,002 | 125.63 | 3,140,996 | 3,490 | 72.20 | 252,004 | 2,888,992 |
| Frar | 16,926 | 83.09 | 1,406,430 | 3,287 | 37.44 | 123,071 | 1,283,359 |
| Marzu | 6,086 | 102.95 | 626,624 | 19,166 | 70.39 | 1,349,126 | −722,502 |
| April | 8,302 | 93.76 | 778,330 | 19,985 | 65.44 | 1,307,834 | −529,503 |
| Mejju | 8,754 | 89.01 | 779,246 | 22,418 | 72.38 | 1,622,534 | −843,288 |
| Ġunju | 3,168 | 59.13 | 187,317 | 31,159 | 89.31 | 2,782,898 | −2,595,581 |
| Lulju | 1,789 | 163.51 | 292,606 | 38,784 | 101.78 | 3,947,490 | −3,654,885 |
| Awwissu | 1,227 | 160.79 | 197,319 | 45,848 | 130.53 | 5,984,489 | −5,787,170 |
| Settembru | 2,142 | 165.19 | 353,876 | 10,058 | 140.81 | 1,416,253 | −1,062,377 |
| Total | 73,398 | 105.76 | 7,762,744 | 194,195 | 96.74 | 18,785,698 | −11,022,954 |
Is-Serbja
Xahar b’xahar, din il-fruntiera vista min-naħa waħda: Il-Montenegro.
| Xahar | Esportazzjonijiet fiżiċi MWh | €/MWh | € | Importazzjonijiet fiżiċi MWh | €/MWh | € | Differenza € |
|---|---|---|---|---|---|---|---|
| Jannar | 37,847 | 106.05 | 4,013,689 | 34 | 114.40 | 3,904 | 4,009,785 |
| Frar | 33,014 | 64.98 | 2,145,336 | 390 | 122.59 | 47,819 | 2,097,517 |
| Marzu | 25,978 | 88.06 | 2,287,595 | 836 | 91.00 | 76,064 | 2,211,531 |
| April | 11,392 | 69.69 | 793,936 | 6,194 | 101.48 | 628,607 | 165,329 |
| Mejju | 26,438 | 75.10 | 1,985,563 | 1,201 | 119.19 | 143,179 | 1,842,385 |
| Ġunju | 15,410 | 92.73 | 1,429,024 | 1,778 | 94.72 | 168,421 | 1,260,603 |
| Lulju | 8,110 | 111.91 | 907,575 | 4,620 | 135.32 | 625,105 | 282,470 |
| Awwissu | 9,375 | 140.08 | 1,313,355 | 4,889 | 172.50 | 843,360 | 469,994 |
| Settembru | 3,130 | 142.41 | 445,798 | 1,483 | 182.61 | 270,844 | 174,954 |
| Total | 170,694 | 89.76 | 15,321,873 | 21,425 | 131.03 | 2,807,303 | 12,514,570 |
Metodu
Mhijiex fattura. L-elettriku transfruntier ma jinbiegħx minn pajjiż għal pajjiż: is-swieq huma akkoppjati u l-fluss fiżiku huwa r-riżultat ta’ irkant komuni. Dawn iċ-ċifri jivvalutaw il-fluss imkejjel bil-prezz ta’ ġurnata bil-quddiem ta’ din iż-żona stess, sabiex iż-żewġ direzzjonijiet ikunu jistgħu jitqabblu fuq l-istess skala.
Il-flussi huma mkejla, kwart ta’ siegħa b’kwart ta’ siegħa; il-fruntieri b’data ta’ kull siegħa jitqassmu fuq l-erba’ kwarti li jkopru, sabiex kull megawatt-siegħa tiltaqa’ mal-prezz li effettivament kien fis-seħħ. L-enerġija li tidħol fil-pajjiż mhijiex l-istess bħall-enerġija kkonsmata hawn — parti minnha tgħaddi biss.
Pajjiż bejn żewġ pajjiżi oħra jġorr enerġija li la tiġi prodotta u lanqas ikkonsmata fih. L-enerġija li tidħol mhijiex enerġija użata.